Solar PV System for Sports Facility
Project Goal
With 10 multi-sport stadiums, 10 aquatic areas, and over 30 individual courts, MSAC carries a heavy, continuous electrical load. Pumps, chillers, fans, and lighting run across long operating hours. The State Sport Centres Trust engaged us with a clear objective to reduce operational energy costs and increase the site’s reliance on renewable energy.
Inside the Build
Maximising Solar Generation
The MSAC building includes tower structures and cables that cast shadows across the roof. While these shadows may seem small, they significantly reduce solar generation on traditional panels. A system design that avoids these shadows would cap the system at around 800 kW.
We took a different approach. By using solar panels with cell-optimised technology, we ensured that even when some individual cells are shaded, the rest of the panel continues to operate at peak performance. Managing the shade rather than avoiding it let us scale the system to 1.3 MW, capturing the maximum renewable energy from the available roof space.
Working with the Structure
The facility is also known for its iconic curved roofline. A standard tilted mounting system would have sat perpendicular to the curve and altered the building’s silhouette. To preserve the curved aesthetics, we installed a flush-mount system. This approach served a dual purpose: it maintained the building’s visual integrity and let us fit more panels by eliminating the clearance gaps required for tilted rows.
We had to safely secure 2,016 panels and four kilometres of rail, totalling over 56 tonnes of equipment, onto a steep, curved surface. Before laying any rail, we trialled an installation on the sharpest curves and ran comprehensive wind and dead-load tests to ensure absolute structural safety.
Making Space for the Future
A room near the main switchboard, which had housed MSAC’s 20-year-old gas cogeneration unit, was repurposed for the nine new inverters and the PV distribution board. The cogeneration unit itself is being redeployed for a second life on an agricultural farm. Clearing this space marked a symbolic energy transition for MSAC. Clearing this space marked a symbolic energy transition for MSAC. The room that once held legacy gas infrastructure now runs the facility’s renewable energy system.
Project Summary
1.3 MW
Total system size
$70,000
Est. annual cost saving
1 GWh
Est. generation (year 1)
25%
Solar offset